Jan. 20, 2025
Xinjiang Aksu Jinhui Zhaofeng Company coal storage yard environmental protection fully closed EPC project
Project overview:
The EPC project of Xinjiang Jinhui Zhaofeng Coking Co., Ltd. is located in Xinjiang Jinhui Zhaofeng Industrial Park, Baicheng County, Aksu Region, Xinjiang. The project includes 2 raw coal storage shed, with a projected area of 52,988 square meters and an expansion area of about 70,000 square meters. They are raw coal field A and raw coal field B respectively.
The sealing size of Section A of the raw coal yard is 168.588m (east-west) ×157.4m (North-South). The projected area of the grid in Zone A: 29,580 square meters, and the expanded area is about 35,000 square meters; The sealing size of Section B of the raw coal yard is 168.588m (east-west) ×156.9m (North-South). The projected area of the grid in Zone B: 29,580 square meters, and the expanded area is about 35,000 square meters.